Lump Sum Projects in Horizon Europe: Best Practices for Work Packages and Financial Management

Picture of Admin Kronis
Admin Kronis


JAN 30, 2025


4 MIN


GUIDE

Table of Content

Lump sum grants in Horizon Europe place the emphasis on completing work packages (WPs) rather than submitting detailed cost reports. This can lighten the administrative burden but does not eliminate checks on your capacity to perform the work or the possibility of audits. Below is an overview of how lump sum funding works, why splitting WPs can help your cash flow, and how Kronis supports reporting periods and documentation.


How Lump Sum Grants Work

  1. Payment for Results
    Once a WP is finished and accepted, you can receive the agreed lump sum for that WP after acceptance in the following Reporting Period.

  2. No Detailed Cost Reporting
    You don’t need monthly or quarterly cost statements. Travel, staff hours, and other expenses do not require the same level of itemised documentation, although audits remain, so it is not advisable to follow a different procedure as with your usual accounting.

  3. Audits Remain
    Although you won’t be required to keep timesheets, you may be asked to show that your team actually carried out the tasks and had sufficient staff, equipment, and expertise to do so. So what happens if you are audited several projects (lump-sum & not lump-sum) at once? How do you demonstrate the same researchers have not been working over their productive time overall?

  4. Risk of Partial Payment
    If you only deliver part of a WP, the payment for that package may be proportionally reduced.

Splitting Work Packages for Better Cash Flow

Many projects have broad WPs (e.g. “Project Management” or “Dissemination”) that last the entire project. Under a lump sum, payment for such a WP only arrives at the end. Splitting those WPs across reporting periods can help:

  1. Improve Cash Flow
    Instead of waiting for a large payment at the end, you receive partial funds throughout the project.

  2. Align with Milestones
    Dividing a WP into segments (e.g. “Management WP1,” “Management WP2,” etc.) makes it clear which tasks are due at each stage.

  3. Balance Detail vs. Complexity
    More, smaller WPs bring frequent payments but require extra tracking. Pick a structure that suits your team without creating too much admin overhead.

Managing Reporting Periods with Kronis

Kronis does not manage tasks at a granular level, but it helps you organize reporting periods and store evidences of your costs:

  • Reporting Period Setup
    You define reporting periods that match your WP splits, which ensures clarity on how much needs to be spent—and by when—to trigger earlier payments.

  • Document and Deliverable Storage
    Though no cost breakdowns are required, you must keep tangible evidence (reports, prototypes, etc.). Kronis stores these files in a single repository.

  • Audit Readiness
    If auditors need proof of execution capacity, Kronis can show when each WP was declared complete, and how your researchers contributed.

Recommendations for Lump Sum Success

  1. Plan WPs Carefully
    Split them if you want more regular payments, but avoid unnecessary micromanagement.

  2. Keep Evidence Organized
    Store design documents, test results, meeting notes—anything that proves you performed the work.

  3. Prepare for Partial Reductions
    If a WP isn’t fully delivered, the payment might drop. Monitor progress closely to avoid last-minute surprises.

  4. Stay Audit-Ready
    Lump sum doesn’t remove audits. Have a clear method for showing that your team and equipment were in place to do the job.

Conclusion

Lump sum grants in Horizon Europe save time by removing monthly cost reporting, but they still demand a solid structure, consistent documentation, and the ability to prove that tasks are completed. Splitting WPs can enhance cash flow, while a clear reporting setup ensures that everyone knows their responsibilities. Kronis helps coordinate these elements by offering a repository for deliverables and straightforward tracking of reporting periods.

Feel free to register totally free at kronis.app and check how we can help you manage your Horizon Europe Lump Sum Projects.

Your Solution For Navigating Grants

With Kronis Software, we make the process simple.
Jan 30, 20254 minblog
Table Of Contents

Kronis Software

The solution to navigating EU funding complexities

Blogs

Our latest blog posts

From grant searching to managing it: see Kronis at Startup Olé 2026

Kronis is heading to Startup OLÉ 2026! Meet us in Salamanca, see Kronis in action and discover how our five tools support different stages of the funding journey.

Horizon Europe vs cascade funding: which route is right for your organisation?

Horizon Europe and cascade funding both offer EU innovation funding — but they are fundamentally different instruments. This guide maps the key differences and helps you decide which route fits your organisation right now.

Kronis Finance: financial control for EU-funded projects

EU project financial compliance begins on day one and extends years beyond project closure. Kronis Finance provides the infrastructure to plan, report, and analyse EU project finances — keeping costs traceable, eligible, and audit-ready throughout.

Ready To Close The Loop On Your Grants?

Join hundreds of EU-funded organisations using Kronis to find, qualify, apply, manage and justify their projects.